Project Update from 18/12/2024
From "Great Broughton Sewage Treatment Works"
Go to the project
I wanted to share a final update on the Great Broughton Sewage Treatment works. The Team have been continuing with their progress and this is an excellent end to the year.
- Rising main pump plinth 2 reinforcement installed and concrete has been poured.
- Rising main 2 Stainless Steel suction pipework installed
- Rising main 1 Stainless Steel inlet pipework installed
- Storm tank footpath and aco drainage constructed.
- Inlet channel cored through to confirm reinforcement depth, good news no change to our current design required.
- Prepped road and chambers ready for final road pour this week.
In the event that you require some assistance in our absence during the Christmas Break, please contact 0345 7171100