Project Update from 16/12/2024
From "Aldbrough St John Sewage Treatment Works"
Go to the project
I wanted to share a final update for the year so that you are aware of some recent progress made by the Team on Site.
- Rising main pump plinth 2 reinforcement installed and concrete poured.
- Rising main 2 Stainless Steel suction pipework installed
- Rising main 1 Stainless Steel inlet pipework installed
- Storm tank footpath and aco drainage constructed.
- Inlet channel cored through to confirm reinforcement depth, good news no change to our current design required.
- Prepped road and chambers ready for final road pour this week.
In the event that you require some assistance in our absence during the Christmas Break, please contact 07813 406 984.
We wish you a Merry Christmas and a Happy and Healthy 2025.
Comments
Commenting is not possible because this project is currently not active.
Total likes: 1, total dislikes: 0
. You can no longer react to ideas in Aldbrough St John Sewage Treatment Works. You can no longer react to ideas in Aldbrough St John Sewage Treatment Works
Share
Posted by
Current status
Update