Project Update from 14/02/2025
From "Kirklevington Transfer WINEP"
Go to the project
The ductile iron pipework has now been installed to flow meter, valve chamber and wet well. Backfilling levels to tank and chambers have begun, as well as the duct work being installed to allow power to the area.
Remaining drainage has been installed for tank overflow and foul water inlet into Carlow tank.