Project Update from 05/11/2024

From "Slaley Improvements WINEP"

Go to the project

Good progress has been made on site this month, we have poured the concrete slab for the Soneco feed and installed the pipework upon this slab. We have also poured concrete steps to the where the Mecana unit (filtration system) will be situated. The site returns pumping station has been installed including, valve slab, pipework and ducting. Along with our subcontractors WCS, we have installed the Humus settlement tank which removes the smaller solids from the waste water, and are now underway with backfilling the tank. Works have also begun on the installation of the Primary settlement tank, which is used in the initial stages of treatment process it removes floating solids from the waste water. Prior to the Northern Powergrid mains upgrade, the treatment works will be temporarily running on generator power, however, these upgrades are due to be completed by the end of November.

I would like to thank you once again for your continued support while the works on site continue. If you have any questions or concerns please leave a comment below.

Comments

Please to comment.
Total likes: 1, total dislikes: 0
. Sign in to react.

Share

Posted by

Current status

Update