Skip to main content
Northumbrian Water Home

Project Update from 01/05/2024

From "County Durham and Tees Valley Project Pipeline"

Go to the project

In recent months, our pipelaying teams have been making excellent progress. If you travel around the County Durham and Tees Valley countryside, you will probably have noticed huge stretches of ground where we’ve cleared the topsoil, excavated the trenches and have now welded together and installed lengths of new pipe.

Our calculations have shown that, as of 19th April, we’ve laid 11,239 linear metres of pipework. This represents 34% of the total required, which is 34km.

The image below is an aerial shot of a completed section to the west of Whorley Hill.

Comments

Please to comment.
Total likes: 1, total dislikes: 0
. Sign in to react.

Share

Posted by

Current status

Update