Over the last few weeks, the team have continued on Selset Reservoir Valve Repair site, with the existing pipework in the lower level of the valve building being removed to allow for refurbishment.

The remaining pipework is being dismantled, with three existing valves retained for refurbishment by Blackhalls. Concrete plinths and blockwork walls are also being broken out, with scaffolding being installed to support the floor during pipework removal.

Clean-up works are underway in the basin to remove broken concrete and blockwork. The scoured area is being reinstated using riprap stone, with sand and gravel displaced by the overland water flow being removed. A section of old pipework is also being installed to help reduce further scouring within the basin.

Scaffolding is being erected around the valve house building in preparation for the demolition works.

Thanks

The Project Team